Real Desalination Projects: Plan 32, Cyclone Separators and High-Pressure Pump Seals

The reference projects announced by EagleBurgmann show real-world sealing at some dissolving plants around the world.
A few examples.
- The Tuaspring plant has a capacity of 318,500 cubic meters of drinking water per day, described as the largest in Southeast Asia, using multiple Sulzer submersible pumps to extract seawater.
- The La Caleta plant in Tenerife, Spain, produces 10,000 cubic meters per day, meeting approximately 40% of the needs of the surrounding communities. Five Sulzer ZF-200 high-voltage booster pumps use the SHV line, with a chamber pressure of 55 bar and a speed of 1,679 runs per minute.
- The Sur factory in Oman uses multi-layer high-pressure pumps for reverse osmosis process, sealed with SHV2 resin.
Two remarkable auxiliary techniques
- Cartex-QN cartridges according to Plan 32 (external clean fluid level) for pumps working with impurities water.
- The cyclone separator in Plan 11 removes the sand from the fluid flow to the debris when the water has a lot of sand.
The lesson
Choosing the correct support scheme according to actual conditions (sand, pressure, speed) is just as important as choosing the pad itself.
Source of reference.
Reference project page of EagleBurgmann. Figures published by the company. Articles compiled and reinterpreted by SNS-VN; brand name belongs to the owner.